период
движение
атмосфера
темы
ключевые слова
тон
- A.D.W. MAIN BUILDING GROUND FLOOR 1RST WORKING DESIGN V.2 (Academy of Sciences, floor plan)
- Чертеж от руки
- LBH BUILDING MACHINERY WOODWORKING MACHINERY HALL 5 (Leipzig Trade Fair, plan view exhibition stand)
- Bauhaus Dessau preliminary course 1926/27. Wassily Kandinsky. Dividual (grid) and inividual (black) design of the square
- Drawing: Construction of a painting studio, Liebermann Haus
- 2ND TOP FLOOR (Institute and lecture hall building Leipzig University Goethe-Straße, floor plan)
основной цвет
- A.D.W. MAIN BUILDING GROUND FLOOR 1RST WORKING DESIGN V.2 (Academy of Sciences, floor plan)
- 4th TOP FLOOR (Floor plan of a building with 22 single rooms)
- 3 WALLS IN THE HALL (Entrance, living room, study)
- ХКБ II - НОВЫЙ ПЛАСТ МИНУЩЕГО ВРЕМЕНА (Министерство внутренних дел, Берлин, план)
- A.D.W. MAIN BUILDING 1RST TOP FLOOR 1RST WORKING DESIGN (Academy of Sciences)
- A.D.W. MAIN BUILDING 1RST TOP FLOOR WORKING DESIGN 1 (Academy of Sciences)
- A.D.W. MAIN BUILDING GROUND FLOOR 1RST WORKING DESIGN V.2 (Academy of Sciences, floor plan)
- Ink Drawing of Han-shan, Shi-de and Feng-gan (Zen hermits)(Three Materials in One Set)
- LBH BUILDING MACHINERY WOODWORKING MACHINERY HALL 5 (Leipzig Trade Fair, plan view exhibition stand)
- Drawing- 02
- Drawing- 03
- Table with section
- Drawing: Construction of a painting studio, Liebermann Haus
- Ink Drawing of Bodhidharma
- 2ND TOP FLOOR (Institute and lecture hall building Leipzig University Goethe-Straße, floor plan)
- Чертеж от руки
- Untitled
- Drawing for Bedroom Painting No. 15
- Ethnographic drawing - gunpowder holder
- Preparatory drawing from In Memory of My Feelings
- Drawing: Construction of a terrasse, Liebermann Haus
- Bauhaus Dessau preliminary course 1926/27. Wassily Kandinsky. Dividual (grid) and inividual (black) design of the square
- South Elevation of Refreshment Wing