Menu
FREE ART CONSULTATION
PreviewPreview AR previewAR preview Buy Hand Made Painting Buy Hand Made PaintingBuy Image Buy Image SendSend
DetailsDetails Add to favorites Add to favorites DownloadDownload SimilarsSimilars X-RayX-Ray DiaporamaDiaporama

Project Meeting The Louvre And The Tuileries

Detailed black & white engraving of Versailles by Charles Percier (1764-1838). Captures 18th-century architectural precision & grandeur. A unique historical artwork for collectors.

Charles Percier (1764-1838) was a leading French Neoclassical architect of the Directoire & Empire styles. Known for palace rejuvenation, iconic designs like the Arc du Carrousel, and collaborations with Pierre Fontaine, he shaped 19th-century French

Giclée / Art Print

Museum-quality giclée or canvas print with fast production and flexible finish options. (Buy Hand Made Painting Buy Hand Made PaintingBuy Image Buy Image)

Standard
custom
CM
INCH

Pick from our preset sizes that match the artwork's original proportions.

width
height

You may enter your own dimensions to fit a specific frame or space. If your selected size does not match the original image's proportions, we will either crop the artwork or extend the image with a mirrored or solid-fill edge. A digital mockup will be sent for your approval before production begins.
Please note that the on-screen preview does not reflect the actual cropping or extension. Only the mockup will accurately show the final composition.
While custom sizes are available, we recommend selecting a dimension from the predefined list to preserve the original proportions.

Worldwide Delivery () in 2 weeks instead of standard 4/5 weeks. (21 August)

why_choose_icon
Free Worldwide Express Shipping
why_choose_icon
High-Quality Linen Canvas
why_choose_icon
Full Shipping Insurance
why_choose_icon
Customs Tax Refund Guarantee
why_choose_icon
True Color Matching Guarantee
why_choose_icon
60-Day Return Policy (Defects Only)
why_choose_icon
100% Money-Back Guarantee
why_choose_icon
Bulk Discount Offer

Total Price

$ 63

reproduction

Project Meeting The Louvre And The Tuileries

Giclée / Art Print

Reproduction Size

-

Total Price

$ 63


Artist Biography

early life and education

charles percier, a renowned french architect, interior decorator, and designer, was born on august 22, 1764, in paris. his family's humble background did not deter him from pursuing his passion for art and architecture. at the age of 12, percier attended a free school for teaching drawing, where his talent was quickly recognized.

partnership with pierre fontaine

percier's collaboration with pierre fontaine, a fellow student at the studio of architect antoine-françois peyre, marked the beginning of a lifelong and highly successful partnership. from 1794 onward, their joint efforts became synonymous with the rich, grand, consciously-archaeological versions of neoclassicism, known as directoire style and empire style.

notable works and legacy

percier's contributions to french architecture and design are numerous. some of his notable works include:
  • view of a roman house (watercolor), showcasing his early fascination with classical roman architecture.
  • participation in the rejuvenation of the palace of tuileries, where his father once worked.
  • collaborations with fontaine on various building and decorative projects during napoleon's reign, including the arc du carrousel and the palais du roi de rome.

museums and collections

percier's works can be found in various museums, including:
  • château de fontainebleau, where he explored the architecture and décor.
  • musée des beaux-arts de carcassonne, featuring a collection of western paintings from the 17th to the 20th century, including works by renowned artists such as françois perrier, lanfranco, pretti, van goyen, morelsee, teniers, rigaud, chardin, corot, courbet, marquet, and morellet.

references and further reading

for more information on charles percier's life and work, visit:

conclusion

charles percier's legacy extends beyond his own works, influencing a new generation of architects and designers, shaping the course of french neoclassical architecture. his partnership with pierre fontaine resulted in some of the most iconic examples of directoire style and empire style, cementing his place in the annals of art history.
charles percier

charles percier

1764 - 1838 , France

Quick Facts

  • Artistic Movement Or Style: Satirical painting/engraving
  • Artists Or Movements Influenced By This Artist: ['Hogarthian style']
  • Artists Who Influenced This Artist: ['French and Italian painters']
  • Date Of Birth: November 10, 1697
  • Date Of Death: October 26, 1764
  • Full Name: William Hogarth
  • Nationality: English
  • Notable Artworks:
    • A Harlot's Progress
    • A Rake's Progress
    • Marriage A-la-Mode
  • Place Of Birth: London, England
Explore artworks organized by themes, styles, and characteristics.