Project Plan Meeting The Louvre And The Tuileries
Hand Made Oil Reproduction
Hand-painted oil on canvas in your size and frame, made to order by our artists. ( Buy Print
Buy Image)
Pick from our preset sizes that match the artwork's original proportions.
You may enter your own dimensions to fit a specific frame or space. If your selected size does not match the original image's proportions, we will either crop the artwork or extend the painting with additional hand-painted elements. A digital mockup will be sent for your approval before production begins.
Please note that the on-screen preview does not reflect the actual cropping or extension. Only the mockup will accurately show the final composition.
While custom sizes are available, we recommend selecting a dimension from the predefined list to preserve the original proportions.
After order, ArtsDot.com team will email client for instructions and provide a mockup preview
Worldwide Delivery () in 3/4 weeks instead of standard 5 weeks. (22 August). No compromise on quality.
Free Worldwide Express Shipping
High-Quality Linen Canvas
Full Shipping Insurance
Customs Tax Refund Guarantee
True Color Matching Guarantee
60-Day Return Policy (Defects Only)
100% Money-Back Guarantee
Bulk Discount Offer
Project Plan Meeting The Louvre And The Tuileries
Reproduction Medium
Reproduction Size
-
Total Price
$ 263
Related Artworks
Artist Biography
early life and education
charles percier, a renowned french architect, interior decorator, and designer, was born on august 22, 1764, in paris. his family's humble background did not deter him from pursuing his passion for art and architecture. at the age of 12, percier attended a free school for teaching drawing, where his talent was quickly recognized.partnership with pierre fontaine
percier's collaboration with pierre fontaine, a fellow student at the studio of architect antoine-françois peyre, marked the beginning of a lifelong and highly successful partnership. from 1794 onward, their joint efforts became synonymous with the rich, grand, consciously-archaeological versions of neoclassicism, known as directoire style and empire style.notable works and legacy
percier's contributions to french architecture and design are numerous. some of his notable works include:- view of a roman house (watercolor), showcasing his early fascination with classical roman architecture.
- participation in the rejuvenation of the palace of tuileries, where his father once worked.
- collaborations with fontaine on various building and decorative projects during napoleon's reign, including the arc du carrousel and the palais du roi de rome.
museums and collections
percier's works can be found in various museums, including:- château de fontainebleau, where he explored the architecture and décor.
- musée des beaux-arts de carcassonne, featuring a collection of western paintings from the 17th to the 20th century, including works by renowned artists such as françois perrier, lanfranco, pretti, van goyen, morelsee, teniers, rigaud, chardin, corot, courbet, marquet, and morellet.
references and further reading
for more information on charles percier's life and work, visit:- discovering the musée des beaux-arts de carcassonne (france)
- wikipedia: charles percier
- explore charles percier's designs and influences at ArtsDot.com: charles percier | 9 artworks
conclusion
charles percier's legacy extends beyond his own works, influencing a new generation of architects and designers, shaping the course of french neoclassical architecture. his partnership with pierre fontaine resulted in some of the most iconic examples of directoire style and empire style, cementing his place in the annals of art history.charles percier
1764 - 1838 , France
Quick Facts
- Artistic Movement Or Style: Satirical painting/engraving
- Artists Or Movements Influenced By This Artist: ['Hogarthian style']
- Artists Who Influenced This Artist: ['French and Italian painters']
- Date Of Birth: November 10, 1697
- Date Of Death: October 26, 1764
- Full Name: William Hogarth
- Nationality: English
- Notable Artworks:
- A Harlot's Progress
- A Rake's Progress
- Marriage A-la-Mode
- Place Of Birth: London, England

Glass option is only available in size under 110 CM